Checking the principal ceilings at Huddersfield Town Hall
Working with Ornate Interiors, we have just finished our investigations into the condition of the Historic Ceiling Plasters of some First Floor Rooms at Huddersfield Town Hall. Detailed repair schedules have been prepared for all areas that were inspected.



Related Articles
A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall, June 2026
Introduction M Womersleys were asked to prepare a scheme for the repair of the listed barn …
Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber
M Womersleys were asked to look at the makeup of the plaster in the Ball Room in the South Wing (Figures…
Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton
M Womersleys were asked to undertake some paint sampling at Hall i'th Wood Museum. Originally, this …