Salts at Minster Yard York
M Womersleys were happy to advice the architects working for York Minster in how to deal with the failing external finish at Minster Yard York. We analysied the render and surface to establish that a wall was contaminated with Sulphate and Chloride based salts, and suggested remedial works to what was an early roman cement bound render.


Related Articles
A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall, June 2026
Introduction M Womersleys were asked to prepare a scheme for the repair of the listed barn …
Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber
M Womersleys were asked to look at the makeup of the plaster in the Ball Room in the South Wing (Figures…
Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton
M Womersleys were asked to undertake some paint sampling at Hall i'th Wood Museum. Originally, this …