• Home
  • About
  • Services
    • Analysis
    • Plasterwork/Render Surveys
    • Ruin Conservation
    • Training
    • International Support
  • Blog
  • Contact Us

Back to Blog List

October 26th 2018

Share|Twitter|Facebook|Email

|

Training at the Jewellery Quarter Birmingham

Fantastic day with students from south and city college Birmingham learning about historical development of buildings around the Jewellery Quarter followed by arch building session The Hive. A great group of young ladies and gentlemen undertaking different levels of brick laying.

 

        

October 26th 2018

Share|Twitter|Facebook|Email

Back to Blog List

Related Articles

A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall,  June 2026

A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall, June 2026

Introduction M Womersleys were asked to prepare a scheme for the repair of the listed barn …

Read Full Article >
Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber

Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber

M Womersleys were asked to look at the makeup of the plaster in the Ball Room in the South Wing (Figures…

Read Full Article >
Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton

Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton

M Womersleys were asked to undertake some paint sampling at Hall i'th Wood Museum. Originally, this …

Read Full Article >

M.Womersleys Historic Building Specialists

T:

Office 2.18, Holmfield Mills, Holdsworth Road, Halifax, HX3 6SN

01422 730040

M: 07802 549634

Copyright © 2026 M.Womersleys | website by TVW